Covers 2026 National Electrical Code changes to feeders, services, and grounding and bonding, beginning with multiple feeders and emergency disconnects in Article 225 and service requirements in Article 230, including service equipment listing, outdoor service disconnects for dwellings, surge protection for emergency responder sleeping quarters, meter sockets, and ground-fault protection for DC services. Participants then review Article 250 changes to performance requirements, separately derived systems, grounding electrode conductors and connections, intersystem bonding, and equipment grounding conductor identification.
The course then addresses medium voltage services in new Article 268, including listing, service-entrance conductor sets, and disconnect location. Later lessons cover new Article 270 for systems over 1000 VAC and 1500 VDC: general grounding requirements, objectionable current, substation fences, main and system bonding jumpers, transformers, separate buildings, portable generators and equipment, impedance grounded systems, grounding electrodes and electrode conductors, equipment grounding conductors, and bonding of piping and structural metal.
Learning objectives
- Identify changes to feeder and service requirements in Articles 225 and 230, including outdoor service disconnects, surge protection, and DC ground-fault protection.
- Apply revised Article 250 requirements for separately derived systems, grounding electrode conductors, intersystem bonding, and receptacle grounding.
- Locate requirements for medium voltage services in new Article 268.
- Determine grounding and bonding requirements for systems over 1000 VAC and 1500 VDC under new Article 270.
Disclosure of proprietary interest. No instructor, subject-matter expert or content author involved in developing or delivering this course holds any financial or ownership interest in any product, instrument, device or material referenced in it, and none receives any royalty, profit share or other consideration from the promotion or endorsement of any product. This course does not endorse any commercial product or service.
Course Features
- Lectures 47
- Quizzes 44
- Duration 52 weeks
- Skill level All levels
- Language English
- Students 16
- Certificate Yes
- Assessments Self
- Format Audio + Text
- 1 Section
- 47 Lessons
- Lessons91
- 1.1Course Orientation
- 1.2About the Course Timer
- 1.3Learning Objectives
- 1.4225.30 – Can Multiple Feeders Supply One Building? (2026 Update)
- 1.5225.30 – Can Multiple Feeders Supply One Building? (2026 Update)1 Question
- 1.6225.41 – How Has the Emergency Disconnect Rule Changed for 2026?
- 1.7225.41 – How Has the Emergency Disconnect Rule Changed for 2026?1 Question
- 1.8230.2 – New Listing Requirements for Service Equipment
- 1.9230.2 – New Listing Requirements for Service Equipment1 Question
- 1.10230.4 – Where Did “Number of Services” Go? (Relocated to 230.4)
- 1.11230.4 – Where Did “Number of Services” Go? (Relocated to 230.4)1 Question
- 1.12230.5 – Can Service Conductors Pass Through Another Building?
- 1.13230.5 – Can Service Conductors Pass Through Another Building?1 Question
- 1.14230.67 – Are Emergency Responder Sleeping Quarters Now Required to Have Surge Protection?
- 1.15230.67 – Are Emergency Responder Sleeping Quarters Now Required to Have Surge Protection?1 Question
- 1.16230.68 – Are Meter Sockets Considered Service Equipment in the 2026 NEC?
- 1.17230.68 – Are Meter Sockets Considered Service Equipment in the 2026 NEC?1 Question
- 1.18230.70 – Mandatory Outdoor Service Disconnects for Dwellings
- 1.19230.70 – Mandatory Outdoor Service Disconnects for Dwellings1 Question
- 1.20230.71 – How Many Service Disconnects? 2026 Updates to 230.71
- 1.21230.71 – How Many Service Disconnects? 2026 Updates to 230.711 Question
- 1.22230.82 – New Equipment Allowed on the Supply Side of Service Disconnects
- 1.23230.82 – New Equipment Allowed on the Supply Side of Service Disconnects1 Question
- 1.24230.95 – New GFPE Requirements for DC Services
- 1.25230.95 – New GFPE Requirements for DC Services1 Question
- 1.26250.109 – How Do You Bond Metal Raceways in Nonmetallic Boxes?
- 1.27250.109 – How Do You Bond Metal Raceways in Nonmetallic Boxes?1 Question
- 1.28250.119 – Are Yellow Wires with Green Stripes Allowed for Hot Circuits?
- 1.29250.119 – Are Yellow Wires with Green Stripes Allowed for Hot Circuits?1 Question
- 1.30250.146 – How Has the Structure for Receptacle Grounding Changed?
- 1.31250.146 – How Has the Structure for Receptacle Grounding Changed?1 Question
- 1.32250.30 – Grounding Separately Derived Systems: Terminology and References
- 1.33250.30 – Grounding Separately Derived Systems: Terminology and References1 Question
- 1.34250.4 – Performance Requirements: Clarifying Grounding and Bonding
- 1.35250.4 – Performance Requirements: Clarifying Grounding and Bonding1 Question
- 1.36250.64 – Can You Run a GEC Through a Mounting Hole? (2026 Update)
- 1.37250.64 – Can You Run a GEC Through a Mounting Hole? (2026 Update)1 Question
- 1.38250.68 – Refining Grounding Electrode Connections
- 1.39250.68 – Refining Grounding Electrode Connections1 Question
- 1.40250.94 – Ensuring Verified Safety: New Listing Requirements for Intersystem Bonding
- 1.41250.94 – Ensuring Verified Safety: New Listing Requirements for Intersystem Bonding1 Question
- 1.42268.1 – Where Did Medium Voltage Services Go in the 2026 NEC?
- 1.43268.1 – Where Did Medium Voltage Services Go in the 2026 NEC?1 Question
- 1.44268.2 – Is Listing Now Mandatory for All Article 268 Service Equipment?
- 1.45268.2 – Is Listing Now Mandatory for All Article 268 Service Equipment?1 Question
- 1.46268.40 – New Location, Same Critical Rules: Limiting Service-Entrance Conductor Sets
- 1.47268.40 – New Location, Same Critical Rules: Limiting Service-Entrance Conductor Sets1 Question
- 1.48268.70 – Where Must High-Voltage Service Disconnects Be Located in the 2026 NEC?
- 1.49268.70 – Where Must High-Voltage Service Disconnects Be Located in the 2026 NEC?1 Question
- 1.50270.102 – How are Bonding Jumpers Sized and Installed for Systems Over 1000V AC / 1500V DC in the 2026 NEC?
- 1.51270.102 – How are Bonding Jumpers Sized and Installed for Systems Over 1000V AC / 1500V DC in the 2026 NEC?1 Question
- 1.52270.104 – How is Bonding of Piping and Structural Metal Handled for Systems Over 1000V AC / 1500V DC in the 2026 NEC?
- 1.53270.104 – How is Bonding of Piping and Structural Metal Handled for Systems Over 1000V AC / 1500V DC in the 2026 NEC?1 Question
- 1.54270.115 – Relocation of Grounding Rules for Portable Equipment on Systems Over 1000V AC / 1500V DC
- 1.55270.115 – Relocation of Grounding Rules for Portable Equipment on Systems Over 1000V AC / 1500V DC1 Question
- 1.56270.118 – Where are Equipment Grounding Conductors Defined for Systems Over 1000V AC / 1500V DC in the 2026 NEC?
- 1.57270.118 – Where are Equipment Grounding Conductors Defined for Systems Over 1000V AC / 1500V DC in the 2026 NEC?1 Question
- 1.58270.119 – New Article 270: EGC Identification Rules for Systems Over 1000V AC / 1500V DC
- 1.59270.119 – New Article 270: EGC Identification Rules for Systems Over 1000V AC / 1500V DC1 Question
- 1.60270.120 – How are Equipment Grounding Conductors Installed for Systems Over 1000V AC / 1500V DC in 2026?
- 1.61270.120 – How are Equipment Grounding Conductors Installed for Systems Over 1000V AC / 1500V DC in 2026?1 Question
- 1.62270.14 – Where Did Substation Fence Grounding Go? (Relocation & Updates)
- 1.63270.14 – Where Did Substation Fence Grounding Go? (Relocation & Updates)1 Question
- 1.64270.24 – Relocated Requirements: Grounding Service-Supplied AC Systems Over 1000V AC
- 1.65270.24 – Relocated Requirements: Grounding Service-Supplied AC Systems Over 1000V AC1 Question
- 1.66270.27 – Relocation of Medium Voltage Grounding Rules and New Exceptions
- 1.67270.27 – Relocation of Medium Voltage Grounding Rules and New Exceptions1 Question
- 1.68270.28 – How are Main and System Bonding Jumpers Regulated for Systems Over 1000V AC / 1500V DC in the 2026 NEC?
- 1.69270.28 – How are Main and System Bonding Jumpers Regulated for Systems Over 1000V AC / 1500V DC in the 2026 NEC?1 Question
- 1.70270.30 – Where Did Transformer Bonding Go? Introduction to Section 270.30 for Systems Over 1000V AC / 1500V DC
- 1.71270.30 – Where Did Transformer Bonding Go? Introduction to Section 270.30 for Systems Over 1000V AC / 1500V DC1 Question
- 1.72270.32 – Grounding Requirements for Separate Buildings for Systems Over 1000V AC / 1500V DC (New Section 270.32)
- 1.73270.32 – Grounding Requirements for Separate Buildings for Systems Over 1000V AC / 1500V DC (New Section 270.32)1 Question
- 1.74270.34 – When Do Portable Generators Require a Ground Rod for Systems Over 1000V AC / 1500V DC?
- 1.75270.34 – When Do Portable Generators Require a Ground Rod for Systems Over 1000V AC / 1500V DC?1 Question
- 1.76270.36 – New Location and Rules for Impedance Grounded Systems Over 1000V AC / 1500V DC
- 1.77270.36 – New Location and Rules for Impedance Grounded Systems Over 1000V AC / 1500V DC1 Question
- 1.78270.4 – Where Did the General Grounding Requirements Go (for systems over 1000vac/1500vdc) in 2026?
- 1.79270.4 – Where Did the General Grounding Requirements Go (for systems over 1000vac/1500vdc) in 2026?1 Question
- 1.80270.52 – Where Did Grounding Electrodes Go? Introduction to Section 270.52 for Systems Over 1000V AC / 1500V DC
- 1.81270.52 – Where Did Grounding Electrodes Go? Introduction to Section 270.52 for Systems Over 1000V AC / 1500V DC1 Question
- 1.82270.53 – New Location for Grounding Electrode System Installation Rules for systems over 1000vac/1500vdc
- 1.83270.53 – New Location for Grounding Electrode System Installation Rules for systems over 1000vac/1500vdc1 Question
- 1.84270.6 – How Do I Handle Objectionable Current in the 2026 NEC for systems over 1000vac/1500vdc?
- 1.85270.6 – How Do I Handle Objectionable Current in the 2026 NEC for systems over 1000vac/1500vdc?1 Question
- 1.86270.64 – Where are Grounding Electrode Conductor Rules for systems over 1000vac/1500vdc in 2026 ?
- 1.87270.64 – Where are Grounding Electrode Conductor Rules for systems over 1000vac/1500vdc in 2026 ?1 Question
- 1.88270.68 – Where Did Grounding Connections Go for system over 1000vac/1500vdc? New Section 270.68
- 1.89270.68 – Where Did Grounding Connections Go for system over 1000vac/1500vdc? New Section 270.681 Question
- 1.90270.94 – Where Are Intersystem Bonding Requirements Located for Systems Over 1000V AC / 1500V DC in the 2026 NEC?
- 1.91270.94 – Where Are Intersystem Bonding Requirements Located for Systems Over 1000V AC / 1500V DC in the 2026 NEC?1 Question
