Course information is currently being finalized. This course is pending approval by the appropriate licensing authority. A complete course description, learning objectives, and curriculum details will be published once approval has been received.
Course Features
- Lectures 89
- Quizzes 88
- Duration 52 weeks
- Skill level All levels
- Language English
- Students 0
- Certificate Yes
- Assessments Self
- 2 Sections
- 89 Lessons
- NEC 2026: Theory and Calculations89
- 1.1Course Orientation
- 1.2110.10 – How has the focus of Section 110.10 shifted regarding Available Fault Current?Copy
- 1.3110.10 – How has the focus of Section 110.10 shifted regarding Available Fault Current?Copy1 Question
- 1.4110.14 – Are Your Compounds “Identified” or Just “Suitable”?Copy
- 1.5110.14 – Are Your Compounds “Identified” or Just “Suitable”?Copy1 Question
- 1.6110.16 – Arc-Flash Labels: From Generic Warnings to Detailed MarkingsCopy
- 1.7110.16 – Arc-Flash Labels: From Generic Warnings to Detailed MarkingsCopy1 Question
- 1.8110.21 – Updating References for Field-Applied Hazard MarkingsCopy
- 1.9110.21 – Updating References for Field-Applied Hazard MarkingsCopy1 Question
- 1.10110.24 – How Must Fault Current Labels Be Marked in 2026?Copy
- 1.11110.24 – How Must Fault Current Labels Be Marked in 2026?Copy1 Question
- 1.12110.26 – How Have Working Space Rules Changed for DC Systems and Enclosed Parts?Copy
- 1.13110.26 – How Have Working Space Rules Changed for DC Systems and Enclosed Parts?Copy1 Question
- 1.14110.31 – How have fence clearance requirements changed for High-Voltage DC systems?Copy
- 1.15110.31 – How have fence clearance requirements changed for High-Voltage DC systems?Copy1 Question
- 1.16120.41 – How are Dwelling Unit Load Calculations Changing in 2026?Copy
- 1.17120.41 – How are Dwelling Unit Load Calculations Changing in 2026?Copy1 Question
- 1.18130.1 – Why have Energy Management Systems moved to Chapter 1?Copy
- 1.19130.1 – Why have Energy Management Systems moved to Chapter 1?Copy1 Question
- 1.20130.2 – What are the New Listing Requirements for Energy Management Equipment?Copy
- 1.21130.2 – What are the New Listing Requirements for Energy Management Equipment?Copy1 Question
- 1.22130.60 – How must Power Control Systems (PCS) handle malfunctions under the 2026 NEC?Copy
- 1.23130.60 – How must Power Control Systems (PCS) handle malfunctions under the 2026 NEC?Copy1 Question
- 1.24130.70 – How Must Power Control System (PCS) Settings Be Configured?Copy
- 1.25130.70 – How Must Power Control System (PCS) Settings Be Configured?Copy1 Question
- 1.26210.11 – Are Small Appliance Circuits Now Strictly Dedicated?Copy
- 1.27210.11 – Are Small Appliance Circuits Now Strictly Dedicated?Copy1 Question
- 1.28210.12 – AFCI Updates: Welding Exceptions & Retrofit FlexibilityCopy
- 1.29210.12 – AFCI Updates: Welding Exceptions & Retrofit FlexibilityCopy1 Question
- 1.30210.14 – Where did the Specific-Purpose Branch Circuits Table go in the 2026 NEC?Copy
- 1.31210.14 – Where did the Specific-Purpose Branch Circuits Table go in the 2026 NEC?Copy1 Question
- 1.32210.17 – Do Dormitories With Cooking Provisions Require Dwelling Unit Branch Circuits?Copy
- 1.33210.17 – Do Dormitories With Cooking Provisions Require Dwelling Unit Branch Circuits?Copy1 Question
- 1.34210.19 – Where Did the Calculation Tables Go? Sizing Branch-Circuit ConductorsCopy
- 1.35210.19 – Where Did the Calculation Tables Go? Sizing Branch-Circuit ConductorsCopy1 Question
- 1.36210.52 – Where Can Receptacles Go? New Restrictions for Islands and CabinetsCopy
- 1.37210.52 – Where Can Receptacles Go? New Restrictions for Islands and CabinetsCopy1 Question
- 1.38210.8 – Updates to GFCI Requirements: Outdoor Outlets, HVAC, and High FrequenciesCopy
- 1.39210.8 – Updates to GFCI Requirements: Outdoor Outlets, HVAC, and High FrequenciesCopy1 Question
- 1.40215.18 – New SPD Requirements for Emergency Service Sleeping QuartersCopy
- 1.41215.18 – New SPD Requirements for Emergency Service Sleeping QuartersCopy1 Question
- 1.42240.4 – How Has Small Conductor Protection and OCPD Terminology Changed?Copy
- 1.43240.4 – How Has Small Conductor Protection and OCPD Terminology Changed?Copy1 Question
- 1.44240.67 – How has Arc Energy Reduction for Large Fuses been Updated?Copy
- 1.45240.67 – How has Arc Energy Reduction for Large Fuses been Updated?Copy1 Question
- 1.46240.87 – How Has Arc Energy Reduction Terminology Updated?Copy
- 1.47240.87 – How Has Arc Energy Reduction Terminology Updated?Copy1 Question
- 1.48242.1 – How Has the Scope of Article 242 Changed for DC Systems?Copy
- 1.49242.1 – How Has the Scope of Article 242 Changed for DC Systems?Copy1 Question
- 1.50242.54 – How have cross-references for surge arrester interconnections changed?Copy
- 1.51242.54 – How have cross-references for surge arrester interconnections changed?Copy1 Question
- 1.52250.122 – Restructured Rules for EGC Sizing and CitationsCopy
- 1.53250.122 – Restructured Rules for EGC Sizing and CitationsCopy1 Question
- 1.54268.31 – New Requirements for Service Conductor Sizing and AmpacityCopy
- 1.55268.31 – New Requirements for Service Conductor Sizing and AmpacityCopy1 Question
- 1.56268.42 – How are Medium Voltage Service Conductors Sized in the 2026 NEC?Copy
- 1.57268.42 – How are Medium Voltage Service Conductors Sized in the 2026 NEC?Copy1 Question
- 1.58270.122 – New Article 270: Sizing EGCs for Medium Voltage SystemsCopy
- 1.59270.122 – New Article 270: Sizing EGCs for Medium Voltage SystemsCopy1 Question
- 1.60270.166 – How are DC Grounding Electrode Conductors Sized in the 2026 NEC?Copy
- 1.61270.166 – How are DC Grounding Electrode Conductors Sized in the 2026 NEC?Copy1 Question
- 1.62270.66 – How Do You Size AC Grounding Electrode Conductors for Systems Over 1000V AC/1500V DC in 2026?Copy
- 1.63270.66 – How Do You Size AC Grounding Electrode Conductors for Systems Over 1000V AC/1500V DC in 2026?Copy1 Question
- 1.64310.16 – New Ampacities for Small Conductors and Copper-Clad AluminumCopy
- 1.65310.16 – New Ampacities for Small Conductors and Copper-Clad AluminumCopy1 Question
- 1.66406.46 – Have Switch Ratings Moved to Article 406?Copy
- 1.67406.46 – Have Switch Ratings Moved to Article 406?Copy1 Question
- 1.68422.11 – New Acronyms and Relocated Tables for Appliance ProtectionCopy
- 1.69422.11 – New Acronyms and Relocated Tables for Appliance ProtectionCopy1 Question
- 1.70525.24 – How has GFCI Protection for Carnivals and Fairs Changed?Copy
- 1.71525.24 – How has GFCI Protection for Carnivals and Fairs Changed?Copy1 Question
- 1.72555.35 – New Fire Pump Rules and GFPE Testing in MarinasCopy
- 1.73555.35 – New Fire Pump Rules and GFPE Testing in MarinasCopy1 Question
- 1.74625.42 – How has EVSE Load Management changed in the 2026 NEC?Copy
- 1.75625.42 – How has EVSE Load Management changed in the 2026 NEC?Copy1 Question
- 1.76680.10 – How has NEC 680.10 changed for Pool Heaters and Heat Pumps?Copy
- 1.77680.10 – How has NEC 680.10 changed for Pool Heaters and Heat Pumps?Copy1 Question
- 1.78680.75 – Does the 2026 NEC Change GFCI Rules for Hydromassage Tubs?Copy
- 1.79680.75 – Does the 2026 NEC Change GFCI Rules for Hydromassage Tubs?Copy1 Question
- 1.80700.32 – When is Re-Evaluation Required for Selective Coordination?Copy
- 1.81700.32 – When is Re-Evaluation Required for Selective Coordination?Copy1 Question
- 1.82700.5 – Where Did the Transfer Equipment Rules Go? (Restructuring 700.5)Copy
- 1.83700.5 – Where Did the Transfer Equipment Rules Go? (Restructuring 700.5)Copy1 Question
- 1.84701.5 – NEC 701.5: Capacity, Rating, and the Shift from Transfer EquipmentCopy
- 1.85701.5 – NEC 701.5: Capacity, Rating, and the Shift from Transfer EquipmentCopy1 Question
- 1.86722.171 – Where Did Fire Alarm Wiring Methods Go? New Section 722.171Copy
- 1.87722.171 – Where Did Fire Alarm Wiring Methods Go? New Section 722.171Copy1 Question
- 1.8890.2 – How Has the Scope of the NEC Been Reorganized for 2026?Copy
- 1.8990.2 – How Has the Scope of the NEC Been Reorganized for 2026?Copy1 Question
- NEC 2026: Grounding, Bonding, and Services88
- 2.1225.30 – Can Multiple Feeders Supply One Building? (2026 Update)Copy
- 2.2225.30 – Can Multiple Feeders Supply One Building? (2026 Update)Copy1 Question
- 2.3225.41 – How Has the Emergency Disconnect Rule Changed for 2026?Copy
- 2.4225.41 – How Has the Emergency Disconnect Rule Changed for 2026?Copy1 Question
- 2.5230.2 – New Listing Requirements for Service EquipmentCopy
- 2.6230.2 – New Listing Requirements for Service EquipmentCopy1 Question
- 2.7230.4 – Where Did “Number of Services” Go? (Relocated to 230.4)Copy
- 2.8230.4 – Where Did “Number of Services” Go? (Relocated to 230.4)Copy1 Question
- 2.9230.5 – Can Service Conductors Pass Through Another Building?Copy
- 2.10230.5 – Can Service Conductors Pass Through Another Building?Copy1 Question
- 2.11230.67 – Are Emergency Responder Sleeping Quarters Now Required to Have Surge Protection?Copy
- 2.12230.67 – Are Emergency Responder Sleeping Quarters Now Required to Have Surge Protection?Copy1 Question
- 2.13230.68 – Are Meter Sockets Considered Service Equipment in the 2026 NEC?Copy
- 2.14230.68 – Are Meter Sockets Considered Service Equipment in the 2026 NEC?Copy1 Question
- 2.15230.70 – Mandatory Outdoor Service Disconnects for DwellingsCopy
- 2.16230.70 – Mandatory Outdoor Service Disconnects for DwellingsCopy1 Question
- 2.17230.71 – How Many Service Disconnects? 2026 Updates to 230.71Copy
- 2.18230.71 – How Many Service Disconnects? 2026 Updates to 230.71Copy1 Question
- 2.19230.82 – New Equipment Allowed on the Supply Side of Service DisconnectsCopy
- 2.20230.82 – New Equipment Allowed on the Supply Side of Service DisconnectsCopy1 Question
- 2.21230.95 – New GFPE Requirements for DC ServicesCopy
- 2.22230.95 – New GFPE Requirements for DC ServicesCopy1 Question
- 2.23250.109 – How Do You Bond Metal Raceways in Nonmetallic Boxes?Copy
- 2.24250.109 – How Do You Bond Metal Raceways in Nonmetallic Boxes?Copy1 Question
- 2.25250.119 – Are Yellow Wires with Green Stripes Allowed for Hot Circuits?Copy
- 2.26250.119 – Are Yellow Wires with Green Stripes Allowed for Hot Circuits?Copy1 Question
- 2.27250.146 – How Has the Structure for Receptacle Grounding Changed?Copy
- 2.28250.146 – How Has the Structure for Receptacle Grounding Changed?Copy1 Question
- 2.29250.30 – Grounding Separately Derived Systems: Terminology and ReferencesCopy
- 2.30250.30 – Grounding Separately Derived Systems: Terminology and ReferencesCopy1 Question
- 2.31250.4 – Performance Requirements: Clarifying Grounding and BondingCopy
- 2.32250.4 – Performance Requirements: Clarifying Grounding and BondingCopy1 Question
- 2.33250.64 – Can You Run a GEC Through a Mounting Hole? (2026 Update)Copy
- 2.34250.64 – Can You Run a GEC Through a Mounting Hole? (2026 Update)Copy1 Question
- 2.35250.68 – Refining Grounding Electrode ConnectionsCopy
- 2.36250.68 – Refining Grounding Electrode ConnectionsCopy1 Question
- 2.37250.94 – Ensuring Verified Safety: New Listing Requirements for Intersystem BondingCopy
- 2.38250.94 – Ensuring Verified Safety: New Listing Requirements for Intersystem BondingCopy1 Question
- 2.39268.1 – Where Did Medium Voltage Services Go in the 2026 NEC?Copy
- 2.40268.1 – Where Did Medium Voltage Services Go in the 2026 NEC?Copy1 Question
- 2.41268.2 – Is Listing Now Mandatory for All Article 268 Service Equipment?Copy
- 2.42268.2 – Is Listing Now Mandatory for All Article 268 Service Equipment?Copy1 Question
- 2.43268.40 – New Location, Same Critical Rules: Limiting Service-Entrance Conductor SetsCopy
- 2.44268.40 – New Location, Same Critical Rules: Limiting Service-Entrance Conductor SetsCopy1 Question
- 2.45268.70 – Where Must High-Voltage Service Disconnects Be Located in the 2026 NEC?Copy
- 2.46268.70 – Where Must High-Voltage Service Disconnects Be Located in the 2026 NEC?Copy1 Question
- 2.47270.102 – How are Bonding Jumpers Sized and Installed for Systems Over 1000V AC / 1500V DC in the 2026 NEC?Copy
- 2.48270.102 – How are Bonding Jumpers Sized and Installed for Systems Over 1000V AC / 1500V DC in the 2026 NEC?Copy1 Question
- 2.49270.104 – How is Bonding of Piping and Structural Metal Handled for Systems Over 1000V AC / 1500V DC in the 2026 NEC?Copy
- 2.50270.104 – How is Bonding of Piping and Structural Metal Handled for Systems Over 1000V AC / 1500V DC in the 2026 NEC?Copy1 Question
- 2.51270.115 – Relocation of Grounding Rules for Portable Equipment on Systems Over 1000V AC / 1500V DCCopy
- 2.52270.115 – Relocation of Grounding Rules for Portable Equipment on Systems Over 1000V AC / 1500V DCCopy1 Question
- 2.53270.118 – Where are Equipment Grounding Conductors Defined for Systems Over 1000V AC / 1500V DC in the 2026 NEC?Copy
- 2.54270.118 – Where are Equipment Grounding Conductors Defined for Systems Over 1000V AC / 1500V DC in the 2026 NEC?Copy1 Question
- 2.55270.119 – New Article 270: EGC Identification Rules for Systems Over 1000V AC / 1500V DCCopy
- 2.56270.119 – New Article 270: EGC Identification Rules for Systems Over 1000V AC / 1500V DCCopy1 Question
- 2.57270.120 – How are Equipment Grounding Conductors Installed for Systems Over 1000V AC / 1500V DC in 2026?Copy
- 2.58270.120 – How are Equipment Grounding Conductors Installed for Systems Over 1000V AC / 1500V DC in 2026?Copy1 Question
- 2.59270.14 – Where Did Substation Fence Grounding Go? (Relocation & Updates)Copy
- 2.60270.14 – Where Did Substation Fence Grounding Go? (Relocation & Updates)Copy1 Question
- 2.61270.24 – Relocated Requirements: Grounding Service-Supplied AC Systems Over 1000V ACCopy
- 2.62270.24 – Relocated Requirements: Grounding Service-Supplied AC Systems Over 1000V ACCopy1 Question
- 2.63270.27 – Relocation of Medium Voltage Grounding Rules and New ExceptionsCopy
- 2.64270.27 – Relocation of Medium Voltage Grounding Rules and New ExceptionsCopy1 Question
- 2.65270.28 – How are Main and System Bonding Jumpers Regulated for Systems Over 1000V AC / 1500V DC in the 2026 NEC?Copy
- 2.66270.28 – How are Main and System Bonding Jumpers Regulated for Systems Over 1000V AC / 1500V DC in the 2026 NEC?Copy1 Question
- 2.67270.30 – Where Did Transformer Bonding Go? Introduction to Section 270.30 for Systems Over 1000V AC / 1500V DCCopy
- 2.68270.30 – Where Did Transformer Bonding Go? Introduction to Section 270.30 for Systems Over 1000V AC / 1500V DCCopy1 Question
- 2.69270.32 – Grounding Requirements for Separate Buildings for Systems Over 1000V AC / 1500V DC (New Section 270.32)Copy
- 2.70270.32 – Grounding Requirements for Separate Buildings for Systems Over 1000V AC / 1500V DC (New Section 270.32)Copy1 Question
- 2.71270.34 – When Do Portable Generators Require a Ground Rod for Systems Over 1000V AC / 1500V DC?Copy
- 2.72270.34 – When Do Portable Generators Require a Ground Rod for Systems Over 1000V AC / 1500V DC?Copy1 Question
- 2.73270.36 – New Location and Rules for Impedance Grounded Systems Over 1000V AC / 1500V DCCopy
- 2.74270.36 – New Location and Rules for Impedance Grounded Systems Over 1000V AC / 1500V DCCopy1 Question
- 2.75270.4 – Where Did the General Grounding Requirements Go (for systems over 1000vac/1500vdc) in 2026?Copy
- 2.76270.4 – Where Did the General Grounding Requirements Go (for systems over 1000vac/1500vdc) in 2026?Copy1 Question
- 2.77270.52 – Where Did Grounding Electrodes Go? Introduction to Section 270.52 for Systems Over 1000V AC / 1500V DCCopy
- 2.78270.52 – Where Did Grounding Electrodes Go? Introduction to Section 270.52 for Systems Over 1000V AC / 1500V DCCopy1 Question
- 2.79270.53 – New Location for Grounding Electrode System Installation Rules for systems over 1000vac/1500vdcCopy
- 2.80270.53 – New Location for Grounding Electrode System Installation Rules for systems over 1000vac/1500vdcCopy1 Question
- 2.81270.6 – How Do I Handle Objectionable Current in the 2026 NEC for systems over 1000vac/1500vdc?Copy
- 2.82270.6 – How Do I Handle Objectionable Current in the 2026 NEC for systems over 1000vac/1500vdc?Copy1 Question
- 2.83270.64 – Where are Grounding Electrode Conductor Rules for systems over 1000vac/1500vdc in 2026 ?Copy
- 2.84270.64 – Where are Grounding Electrode Conductor Rules for systems over 1000vac/1500vdc in 2026 ?Copy1 Question
- 2.85270.68 – Where Did Grounding Connections Go for system over 1000vac/1500vdc? New Section 270.68Copy
- 2.86270.68 – Where Did Grounding Connections Go for system over 1000vac/1500vdc? New Section 270.68Copy1 Question
- 2.87270.94 – Where Are Intersystem Bonding Requirements Located for Systems Over 1000V AC / 1500V DC in the 2026 NEC?Copy
- 2.88270.94 – Where Are Intersystem Bonding Requirements Located for Systems Over 1000V AC / 1500V DC in the 2026 NEC?Copy1 Question
