Course information is currently being finalized. This course is pending approval by the appropriate licensing authority. A complete course description, learning objectives, and curriculum details will be published once approval has been received.
Course Features
- Lectures 65
- Quizzes 64
- Duration 52 weeks
- Skill level All levels
- Language English
- Students 0
- Certificate Yes
- Assessments Self
- Format Audio + Text
- 2 Sections
- 65 Lessons
- NEC 2026: Wiring Methods and Equipment89
- 1.1Course Orientation
- 1.2300.13 – Major Relocation: Securing and Supporting Moves to Section 300.13
- 1.3300.13 – Major Relocation: Securing and Supporting Moves to Section 300.131 Question
- 1.4300.24 – Is the 360-Degree Bend Limit Now a General Requirement?
- 1.5300.24 – Is the 360-Degree Bend Limit Now a General Requirement?1 Question
- 1.6300.4 – Where Did the Nail Plates Go? The Repurposing of Section 300.4
- 1.7300.4 – Where Did the Nail Plates Go? The Repurposing of Section 300.41 Question
- 1.8300.5 – Major Restructuring: Section 300.5 is Now “Conductors”
- 1.9300.5 – Major Restructuring: Section 300.5 is Now “Conductors”1 Question
- 1.10300.6 – Where Did the Physical Damage Rules Go? (Section 300.6)
- 1.11300.6 – Where Did the Physical Damage Rules Go? (Section 300.6)1 Question
- 1.12300.9 – Managing Temperature Changes: Condensation and Expansion
- 1.13300.9 – Managing Temperature Changes: Condensation and Expansion1 Question
- 1.14305.14 – Where Did the Physical Damage Protection Rules Go? (Systems over 1000VAC/1500VDC)
- 1.15305.14 – Where Did the Physical Damage Protection Rules Go? (Systems over 1000VAC/1500VDC)1 Question
- 1.16305.16 – Where Did the Corrosion Protection Rules Go? (Systems over 1000VAC/1500VDC)
- 1.17305.16 – Where Did the Corrosion Protection Rules Go? (Systems over 1000VAC/1500VDC)1 Question
- 1.18305.17 – How are Temperature Changes Handled in the 2026 NEC? (Systems over 1000VAC/1500VDC)
- 1.19305.17 – How are Temperature Changes Handled in the 2026 NEC? (Systems over 1000VAC/1500VDC)1 Question
- 1.20305.21 – New General Requirements for Securing and Supporting Wiring Methods (Systems over 1000VAC/1500VDC)
- 1.21305.21 – New General Requirements for Securing and Supporting Wiring Methods (Systems over 1000VAC/1500VDC)1 Question
- 1.22305.29 – Where Did Vertical Raceway Supports Go? (New Section 305.29)
- 1.23305.29 – Where Did Vertical Raceway Supports Go? (New Section 305.29)1 Question
- 1.24305.32 – Wiring in Ducts and Plenums (Section 305.32) (Systems over 1000VAC/1500VDC)
- 1.25305.32 – Wiring in Ducts and Plenums (Section 305.32) (Systems over 1000VAC/1500VDC)1 Question
- 1.26310.5 – New Minimum Conductor Sizes and Section Relocation
- 1.27310.5 – New Minimum Conductor Sizes and Section Relocation1 Question
- 1.28312.11 – Where did the Rules for Splices in Switch Enclosures Go?
- 1.29312.11 – Where did the Rules for Splices in Switch Enclosures Go?1 Question
- 1.30314.27 – Outlet Box Support and Fan Box Locations: 2026 Revisions
- 1.31314.27 – Outlet Box Support and Fan Box Locations: 2026 Revisions1 Question
- 1.32342.30 – Updates to IMC Securing and Supporting References
- 1.33342.30 – Updates to IMC Securing and Supporting References1 Question
- 1.34400.10 – Clarifying References for Flexible Cord Requirements
- 1.35400.10 – Clarifying References for Flexible Cord Requirements1 Question
- 1.36402.13 – Where Did Table 402.3 Go? New Location for Fixture Wire Types
- 1.37402.13 – Where Did Table 402.3 Go? New Location for Fixture Wire Types1 Question
- 1.38404.2 – Where Did the “Neutral at the Switch” Rule Go? (New Listing Requirements)
- 1.39404.2 – Where Did the “Neutral at the Switch” Rule Go? (New Listing Requirements)1 Question
- 1.40406.12 – Where Did General Installation Requirements for receptacles, cord connectors, and attachment plugs Go?
- 1.41406.12 – Where Did General Installation Requirements for receptacles, cord connectors, and attachment plugs Go?1 Question
- 1.42406.14 – Where Did Receptacle Mounting Rules Go in the 2026 NEC?
- 1.43406.14 – Where Did Receptacle Mounting Rules Go in the 2026 NEC?1 Question
- 1.44406.16 – Did Receptacle Faceplate Rules Move?
- 1.45406.16 – Did Receptacle Faceplate Rules Move?1 Question
- 1.46406.18 – Where did the rules for Attachment Plugs and Connectors go in 2026?
- 1.47406.18 – Where did the rules for Attachment Plugs and Connectors go in 2026?1 Question
- 1.48406.19 – Where Did Grounding-Type Receptacle Rules Go? (Relocation to 406.19)
- 1.49406.19 – Where Did Grounding-Type Receptacle Rules Go? (Relocation to 406.19)1 Question
- 1.50406.26 – Where are Tamper-Resistant Receptacles Now Required?
- 1.51406.26 – Where are Tamper-Resistant Receptacles Now Required?1 Question
- 1.52406.28 – Where Did Single-Pole Separable Connectors Go? Understanding New Section 406.28
- 1.53406.28 – Where Did Single-Pole Separable Connectors Go? Understanding New Section 406.281 Question
- 1.54406.30 – Where Did the Neutral Rule Go? Relocation of Switch Connections
- 1.55406.30 – Where Did the Neutral Rule Go? Relocation of Switch Connections1 Question
- 1.56406.38 – Where Did the Switch Grouping Rule Go? Understanding New Section 406.38
- 1.57406.38 – Where Did the Switch Grouping Rule Go? Understanding New Section 406.381 Question
- 1.58406.40 – Switch Faceplates Relocated and Expanded to Include Dimmers and Control Switches
- 1.59406.40 – Switch Faceplates Relocated and Expanded to Include Dimmers and Control Switches1 Question
- 1.60406.9 – 406.9 includes switches now?
- 1.61406.9 – 406.9 includes switches now?1 Question
- 1.62408.10 – Where Did the Busbar Rules Go? A Move to 408.10
- 1.63408.10 – Where Did the Busbar Rules Go? A Move to 408.101 Question
- 1.64408.3 – New Rules for Reconditioned Equipment (Section 408.3)
- 1.65408.3 – New Rules for Reconditioned Equipment (Section 408.3)1 Question
- 1.66409.110 – SCCR Visibility and Marking Updates for Industrial Control Panels
- 1.67409.110 – SCCR Visibility and Marking Updates for Industrial Control Panels1 Question
- 1.68410.116 – Recessed Luminaire Clearances and Fire-Rated Installations
- 1.69410.116 – Recessed Luminaire Clearances and Fire-Rated Installations1 Question
- 1.70410.64 – Can Luminaires Be Used as Raceways?
- 1.71410.64 – Can Luminaires Be Used as Raceways?1 Question
- 1.72424.19 – How Have Disconnecting Means for Space Heating Changed?
- 1.73424.19 – How Have Disconnecting Means for Space Heating Changed?1 Question
- 1.74426.60 – How Does the 2026 NEC Address Conductive Pavement Heating?
- 1.75426.60 – How Does the 2026 NEC Address Conductive Pavement Heating?1 Question
- 1.76426.62 – Where are Conductive Pavement Heating Systems Prohibited?
- 1.77426.62 – Where are Conductive Pavement Heating Systems Prohibited?1 Question
- 1.78625.2 – How Have Listing Requirements for EV Equipment Changed?
- 1.79625.2 – How Have Listing Requirements for EV Equipment Changed?1 Question
- 1.80625.40 – Did the Exception for EV Branch Circuits Change in 2026?
- 1.81625.40 – Did the Exception for EV Branch Circuits Change in 2026?1 Question
- 1.82625.43 – Emergency Shutoffs and Expanded Disconnect Rules for EVSE
- 1.83625.43 – Emergency Shutoffs and Expanded Disconnect Rules for EVSE1 Question
- 1.84625.44 – New Plug Ratings and Voltage Options for EV Chargers
- 1.85625.44 – New Plug Ratings and Voltage Options for EV Chargers1 Question
- 1.86625.5 – Are You Labeling EVSE Correctly Under the New 2026 Rules?
- 1.87625.5 – Are You Labeling EVSE Correctly Under the New 2026 Rules?1 Question
- 1.88706.31 – Did the 2026 NEC Remove the Current-Limiting Requirement for ESS?
- 1.89706.31 – Did the 2026 NEC Remove the Current-Limiting Requirement for ESS?1 Question
- NEC 2026: Special Conditions40
- 2.1500.30 – How Does the New Section 500.30 Standardize Bonding in Hazardous Locations?
- 2.2500.30 – How Does the New Section 500.30 Standardize Bonding in Hazardous Locations?1 Question
- 2.3500.7 – Does Gas Detection Replace Purge Cycles in Hazardous Locations?
- 2.4500.7 – Does Gas Detection Replace Purge Cycles in Hazardous Locations?1 Question
- 2.5500.8 – Clarifying Equipment vs. Installation in Hazardous Locations
- 2.6500.8 – Clarifying Equipment vs. Installation in Hazardous Locations1 Question
- 2.7501.10 – How 501.10 Transformed Wiring Methods into Tables
- 2.8501.10 – How 501.10 Transformed Wiring Methods into Tables1 Question
- 2.9501.15 – Clarifying Boundary Seals and Cable Types in Hazardous Locations
- 2.10501.15 – Clarifying Boundary Seals and Cable Types in Hazardous Locations1 Question
- 2.11511.5 – Where did the Area Classification rules for Commercial Garages go?
- 2.12511.5 – Where did the Area Classification rules for Commercial Garages go?1 Question
- 2.13511.6 – How Have Commercial Garage Rules Changed for 2026?
- 2.14511.6 – How Have Commercial Garage Rules Changed for 2026?1 Question
- 2.15512.5 – How are Hazardous Locations Classified for Cannabis Oil Equipment?
- 2.16512.5 – How are Hazardous Locations Classified for Cannabis Oil Equipment?1 Question
- 2.17514.5 – Where Did Classification Go? Relocation of Hazardous Locations
- 2.18514.5 – Where Did Classification Go? Relocation of Hazardous Locations1 Question
- 2.19515.5 – Relocation of Classification Rules for Bulk Storage Plants
- 2.20515.5 – Relocation of Classification Rules for Bulk Storage Plants1 Question
- 2.21516.8 – Spray Area Safety: Renumbering and Static Grounding Requirements
- 2.22516.8 – Spray Area Safety: Renumbering and Static Grounding Requirements1 Question
- 2.23516.9 – New Location for Wiring Rules Above Spray Areas
- 2.24516.9 – New Location for Wiring Rules Above Spray Areas1 Question
- 2.25590.4 – Where Did the Rules Go? Section 590.4 Completely Restructured
- 2.26590.4 – Where Did the Rules Go? Section 590.4 Completely Restructured1 Question
- 2.27590.6 – Major Restructuring: General Rules Move to 590.6
- 2.28590.6 – Major Restructuring: General Rules Move to 590.61 Question
- 2.29625.17 – EVSE Cords: “Hand Fastened” Terminology and Ampacity Clarity
- 2.30625.17 – EVSE Cords: “Hand Fastened” Terminology and Ampacity Clarity1 Question
- 2.31680.2 – Is Listing Now Mandatory for All Pool and Spa Equipment?
- 2.32680.2 – Is Listing Now Mandatory for All Pool and Spa Equipment?1 Question
- 2.33680.23 – Clarified Bonding Requirements for Wet-Niche Luminaires
- 2.34680.23 – Clarified Bonding Requirements for Wet-Niche Luminaires1 Question
- 2.35680.26 – New Materials and Listing Extensions for Pool Bonding
- 2.36680.26 – New Materials and Listing Extensions for Pool Bonding1 Question
- 2.37680.42 – How have the references in Section 680.42 changed for 2026?
- 2.38680.42 – How have the references in Section 680.42 changed for 2026?1 Question
- 2.39680.5 – How Have GFCI Requirements for 3-Phase Pool Equipment Changed?
- 2.40680.5 – How Have GFCI Requirements for 3-Phase Pool Equipment Changed?1 Question
