- 1 Section
- 46 Lessons
Expand all sectionsCollapse all sections
- RCW & WAC Compliance91
- 1.1Course Orientation
- 1.2Core Definitions: Department, Board, and Administrator Roles
- 1.3Quiz – Core Definitions: Department, Board, and Administrator Roles1 Question
- 1.4Defining Electrician Tiers: Master, Journey Level, and Specialty
- 1.5Quiz – Defining Electrician Tiers: Master, Journey Level, and Specialty1 Question
- 1.6Permit-Free Work: Defining “Class A Basic Electrical Work”
- 1.7Quiz – Permit-Free Work: Defining “Class A Basic Electrical Work”1 Question
- 1.8Minor Alterations: Defining “Class B Basic Electrical Work”
- 1.9Quiz – Minor Alterations: Defining “Class B Basic Electrical Work”1 Question
- 1.10The “Like-in-Kind” Standard for Replacements and Repairs
- 1.11Quiz – The “Like-in-Kind” Standard for Replacements and Repairs1 Question
- 1.12Hierarchy of Standards: RCW, WAC, and the NEC’s Role
- 1.13Quiz – Hierarchy of Standards: RCW, WAC, and the NEC’s Role1 Question
- 1.14Local Jurisdiction Authority: When City Rules Exceed State Code
- 1.15Quiz – Local Jurisdiction Authority: When City Rules Exceed State Code1 Question
- 1.16The Unlawful Act: Working Without a Contractor’s License
- 1.17Quiz – The Unlawful Act: Working Without a Contractor’s License1 Question
- 1.18Contractor Financial Security: The $4,000 Bond Requirement
- 1.19Quiz – Contractor Financial Security: The $4,000 Bond Requirement1 Question
- 1.20The Administrator: The Fulcrum of Contractor Compliance
- 1.21Quiz – The Administrator: The Fulcrum of Contractor Compliance1 Question
- 1.22Scope of Work: General (01) vs. Residential (02) Licenses
- 1.23Quiz – Scope of Work: General (01) vs. Residential (02) Licenses1 Question
- 1.24Scope of Work: Pump/Irrigation (03) and Sign (04) Licenses
- 1.25Quiz – Scope of Work: Pump/Irrigation (03) and Sign (04) Licenses1 Question
- 1.26Scope of Work: Limited Energy (06) and HVAC/R (06A) Licenses
- 1.27Quiz – Scope of Work: Limited Energy (06) and HVAC/R (06A) Licenses1 Question
- 1.28Electrical Trainees: Certificate and Biennial Renewal Requirements
- 1.29Quiz – Electrical Trainees: Certificate and Biennial Renewal Requirements1 Question
- 1.30Trainee Supervision: The 75% On-Site and Ratio Rules
- 1.31Quiz – Trainee Supervision: The 75% On-Site and Ratio Rules1 Question
- 1.32Contractor Liability: Verifying Trainee Hours and L&I Audits
- 1.33Quiz – Contractor Liability: Verifying Trainee Hours and L&I Audits1 Question
- 1.34The First Step: Obtaining and Posting the Electrical Work Permit
- 1.35Quiz – The First Step: Obtaining and Posting the Electrical Work Permit1 Question
- 1.36The Class B Permit: A System of Earned Trust and Random Audits
- 1.37Quiz – The Class B Permit: A System of Earned Trust and Random Audits1 Question
- 1.38The Inspector’s Authority: Right of Entry and Disconnection Powers
- 1.39Quiz – The Inspector’s Authority: Right of Entry and Disconnection Powers1 Question
- 1.40The Critical Path Milestone: Prohibition on Concealment Before Inspection
- 1.41Quiz – The Critical Path Milestone: Prohibition on Concealment Before Inspection1 Question
- 1.42Responding to a Correction Notice: Process and Timelines
- 1.43Quiz – Responding to a Correction Notice: Process and Timelines1 Question
- 1.44Final Approval: The Prerequisite for Utility Connection
- 1.45Quiz – Final Approval: The Prerequisite for Utility Connection1 Question
- 1.46Understanding Inspection Fees: Residential, Commercial, and Special
- 1.47Quiz – Understanding Inspection Fees: Residential, Commercial, and Special1 Question
- 1.48Branch Circuit GFCI Rules: Kitchen Definition and Fire Alarm Exemption
- 1.49Quiz – Branch Circuit GFCI Rules: Kitchen Definition and Fire Alarm Exemption1 Question
- 1.50WA AFCI Amendments: Limiting the NEC Requirement to Bedrooms
- 1.51Quiz – WA AFCI Amendments: Limiting the NEC Requirement to Bedrooms1 Question
- 1.52Services: The Mandate to Consult the Serving Utility First
- 1.53Quiz – Services: The Mandate to Consult the Serving Utility First1 Question
- 1.54Service Masts: Conduit Sizing and Structural Support per State Drawings
- 1.55Quiz – Service Masts: Conduit Sizing and Structural Support per State Drawings1 Question
- 1.56Service Disconnect Location: The “15-Foot Rule” for Interior Raceways
- 1.57Quiz – Service Disconnect Location: The “15-Foot Rule” for Interior Raceways1 Question
- 1.58Feeders >400A: The One-Line Diagram Submission Requirement
- 1.59Quiz – Feeders >400A: The One-Line Diagram Submission Requirement1 Question
- 1.60Ground-Fault Protection Testing: The Written Performance Record Mandate
- 1.61Quiz – Ground-Fault Protection Testing: The Written Performance Record Mandate1 Question
- 1.62The Mandatory Concrete-Encased Electrode (CEE) for New Construction
- 1.63Quiz – The Mandatory Concrete-Encased Electrode (CEE) for New Construction1 Question
- 1.64CEE Inspection: Visual Verification vs. Continuity Testing
- 1.65Quiz – CEE Inspection: Visual Verification vs. Continuity Testing1 Question
- 1.66Bonding Flexible Metal Gas Piping: A Critical Fire Safety Measure
- 1.67Quiz – Bonding Flexible Metal Gas Piping: A Critical Fire Safety Measure1 Question
- 1.68Supporting Raceways and Cables from Ceiling Grid Wires
- 1.69Quiz – Supporting Raceways and Cables from Ceiling Grid Wires1 Question
- 1.70Using NM Cable in Commercial Construction: The 15-Minute Barrier Rule
- 1.71Quiz – Using NM Cable in Commercial Construction: The 15-Minute Barrier Rule1 Question
- 1.72Insulating Over Knob-and-Tube: The Contractor Certification and Liability Mandate
- 1.73Quiz – Insulating Over Knob-and-Tube: The Contractor Certification and Liability Mandate1 Question
- 1.74Motor Fuel Dispensers: The Red Emergency Disconnect and 15-Foot Reset Rule
- 1.75Quiz – Motor Fuel Dispensers: The Red Emergency Disconnect and 15-Foot Reset Rule1 Question
- 1.76Marinas and Floating Buildings: Disconnect Location and Wiring Methods
- 1.77Quiz – Marinas and Floating Buildings: Disconnect Location and Wiring Methods1 Question
- 1.78Pools and Spas: The 5-Foot Separation Rule and Listed Package Requirement
- 1.79Quiz – Pools and Spas: The 5-Foot Separation Rule and Listed Package Requirement1 Question
- 1.80Solar PV Systems: On-Site Design Review and Voltage Calculation
- 1.81Quiz – Solar PV Systems: On-Site Design Review and Voltage Calculation1 Question
- 1.82Emergency Systems: Orange Color Coding for Enclosures and Boxes
- 1.83Quiz – Emergency Systems: Orange Color Coding for Enclosures and Boxes1 Question
- 1.84Selective Coordination: The “Tripwire” Effect of Modifying Grandfathered Systems
- 1.85Quiz – Selective Coordination: The “Tripwire” Effect of Modifying Grandfathered Systems1 Question
- 1.86Grounds for Revocation of an Electrician’s Certificate or Contractor’s License
- 1.87Quiz – Grounds for Revocation of an Electrician’s Certificate or Contractor’s License1 Question
- 1.88Key Licensing Exemptions: Utility Work and Non-Profit Volunteering
- 1.89Quiz – Key Licensing Exemptions: Utility Work and Non-Profit Volunteering1 Question
- 1.90Future Code: EVITP Certification for Electric Vehicle Supply Equipment (EVSE)
- 1.91Quiz – Future Code: EVITP Certification for Electric Vehicle Supply Equipment (EVSE)1 Question
Login with your site account
Not a member yet? Register now
Register a new account
Are you a member? Login now