Renew your Colorado electrical license with confidence using this comprehensive, cost-effective 24-hour course package. Designed as a complete all-in-one solution, the curriculum features a core 8-hour review of the latest National Electrical Code (NEC) changes, ensuring you are up to date with the newest standards. You will also sharpen your technical expertise with targeted 4-hour modules on Wiring Methods, Grounding and Bonding, and Theory and Calculations, covering the essential skills needed for modern electrical installations.
In addition to technical training, the package includes a dedicated 4-hour module on Electrical Industry Safety, satisfying critical safety education requirements. By combining code updates, practical theory, and safety protocols into a single, affordable bundle, this course provides the most efficient path to meeting your 24-hour renewal obligation.
Course Features
- Lectures 222
- Quizzes 222
- Duration 52 weeks
- Skill level All levels
- Language English
- Students 0
- Certificate Yes
- Assessments Self
- 27 Sections
- 222 Lessons
- 52 Weeks
- NEC 2023 - Code Update (CH 1-8) - NEC Article 100 Series14
- 1.1110.20 – Reconditioned Equipment
- 1.2110.20 – Reconditioned Equipment1 Question
- 1.3110.21 – Markings
- 1.4110.21 – Markings1 Question
- 1.5110.16(B) – Arc-Flash Hazard Warnings – Service Equipment
- 1.6110.16(B) – Arc-Flash Hazard Warnings – Service Equipment1 Question
- 1.7110.2(B) When Required
- 1.8110.2(B) When Required1 Question
- 1.9110.22(A) – Identification of Disconnecting Means
- 1.10110.22(A) – Identification of Disconnecting Means1 Question
- 1.11120.6 Process for Establishing and Verifying an Electrically Safe Work Condition
- 1.12120.6 Process for Establishing and Verifying an Electrically Safe Work Condition1 Question
- 1.13130.7(C)(5) Hearing Protection
- 1.14130.7(C)(5) Hearing Protection1 Question
- NEC 2023 - Code Update (CH 1-8) - NEC Article 200 Series20
- 2.1210.17 Guest Rooms and Guest Suites
- 2.2210.17 Guest Rooms and Guest Suites1 Question
- 2.3215.18 Surge Protection
- 2.4215.18 Surge Protection1 Question
- 2.5225.41 Emergency Disconnects
- 2.6225.41 Emergency Disconnects1 Question
- 2.7230.67 Surge Protection
- 2.8230.67 Surge Protection1 Question
- 2.9Article 235 – Branch Circuits, Feeders and Services over 1000 Volts AC, 1500 Volts DC, Nominal
- 2.10Article 235 – Branch Circuits, Feeders and Services over 1000 Volts AC, 1500 Volts DC, Nominal1 Question
- 2.11240.2 Reconditioned Equipment
- 2.12240.2 Reconditioned Equipment1 Question
- 2.13Article 245 – Overcurrent Protection over 1000 Volts AC, 1500 Volts DC
- 2.14Article 245 – Overcurrent Protection over 1000 Volts AC, 1500 Volts DC1 Question
- 2.15210.11(C)(4) Garage Branch Circuits
- 2.16210.11(C)(4) Garage Branch Circuits1 Question
- 2.17210.52(G) Basements, Garages, and Accessory Buildings
- 2.18210.52(G) Basements, Garages, and Accessory Buildings1 Question
- 2.19240.24(A) and (E) – Location in or on Premises
- 2.20240.24(A) and (E) – Location in or on Premises1 Question
- NEC 2023 - Code Update (CH 1-8) - NEC Article 300 Series22
- 3.1315.17 Marking for Type Medium Voltage Cable Joints, and Terminations
- 3.2315.17 Marking for Type Medium Voltage Cable Joints, and Terminations1 Question
- 3.3315.32 Uses Permitted for Type Medium Voltage Cables, Cable Joints, and Terminations
- 3.4315.32 Uses Permitted for Type Medium Voltage Cables, Cable Joints, and Terminations1 Question
- 3.5369.10 Uses Permitted for Insulated Bus Pipe (IBP) Systems
- 3.6369.10 Uses Permitted for Insulated Bus Pipe (IBP) Systems1 Question
- 3.7369.120 Marking Insulated Bus Pipe (IBP) Systems
- 3.8369.120 Marking Insulated Bus Pipe (IBP) Systems1 Question
- 3.9371.17 Overcurrent Protection of Flexible Bus System
- 3.10371.17 Overcurrent Protection of Flexible Bus System1 Question
- 3.11371.30 Securing and Supporting
- 3.12371.30 Securing and Supporting1 Question
- 3.13398.15 Exposed Work
- 3.14398.15 Exposed Work1 Question
- 3.15300.3 (C) Conductors of Different Systems
- 3.16300.3 (C) Conductors of Different Systems1 Question
- 3.17300.11(C) Raceways Used as Means of Support
- 3.18300.11(C) Raceways Used as Means of Support1 Question
- 3.19320.3(A)(1) Electrical Hazard Thresholds.
- 3.20320.3(A)(1) Electrical Hazard Thresholds.10 Minutes1 Question
- 3.21371.10 and 371.12 Uses Permitted and Not Permitted
- 3.22371.10 and 371.12 Uses Permitted and Not Permitted1 Question
- NEC 2023 - Code Update (CH 1-8) - NEC Article 400 Series22
- 4.1404.16 Reconditioned Equipment
- 4.2404.16 Reconditioned Equipment1 Question
- 4.3406.12 Tamper-Resistant Receptacles.
- 4.4406.12 Tamper-Resistant Receptacles.1 Question
- 4.5408.4 Descriptions Required
- 4.6408.4 Descriptions Required1 Question
- 4.7408.9 Replacement Panelboards
- 4.8408.9 Replacement Panelboards1 Question
- 4.9409.70 Surge Protection
- 4.10409.70 Surge Protection1 Question
- 4.11410.197 Germicidal Irradiation Systems
- 4.12410.197 Germicidal Irradiation Systems1 Question
- 4.13410.71(1) General
- 4.14410.71(1) General1 Question
- 4.15430.2 Reconditioned Motors
- 4.16430.2 Reconditioned Motors1 Question
- 4.17445.19 Emergency Shutdown of Prime Mover
- 4.18445.19 Emergency Shutdown of Prime Mover1 Question
- 4.19470.2 Reconditioned Equipment
- 4.20470.2 Reconditioned Equipment1 Question
- 4.21406.6(D) Receptacle Faceplate (Cover Plates) With Integral Night Light and/or USB Charger
- 4.22406.6(D) Receptacle Faceplate (Cover Plates) With Integral Night Light and/or USB Charger1 Question
- NEC 2023 - Code Update (CH 1-8) - NEC Article 500 Series14
- 5.1512.13 Wiring Installed Above Hazardous (Classified) Locations
- 5.2512.13 Wiring Installed Above Hazardous (Classified) Locations1 Question
- 5.3517.30(B) Power Sources for the EES
- 5.4517.30(B) Power Sources for the EES1 Question
- 5.5518.5 Supply
- 5.6518.5 Supply1 Question
- 5.7547.26 Physical Protection
- 5.8547.26 Physical Protection1 Question
- 5.9500.5 (D) Classifications of Locations
- 5.10500.5 (D) Classifications of Locations1 Question
- 5.11512.3(A) Cannabis Oil Equipment and Systems Other Than Booths
- 5.12512.3(A) Cannabis Oil Equipment and Systems Other Than Booths1 Question
- 5.13512.3(B) Cannabis Oil Booths
- 5.14512.3(B) Cannabis Oil Booths1 Question
- NEC 2023 - Code Update (CH 1-8) - NEC Article 600 Series26
- 6.1600.35 – Retrofit Kits
- 6.2600.35 – Retrofit Kits1 Question
- 6.3625.40 Electric Vehicle Branch Circuit
- 6.4625.40 Electric Vehicle Branch Circuit1 Question
- 6.5625.49 – Island Mode
- 6.6625.49 – Island Mode1 Question
- 6.7625.6 – Listed
- 6.8625.6 – Listed1 Question
- 6.9630.8 – Electric Welders
- 6.10630.8 – Electric Welders1 Question
- 6.11690.1 New illustration to help understand PV components
- 6.12690.1 New illustration to help understand PV components1 Question
- 6.13690.12 – Rapid Shutdown Requirements
- 6.14690.12 – Rapid Shutdown Requirements1 Question
- 6.15690.15 – Disconnecting Means for Isolating Photovoltaic Equipment
- 6.16690.15 – Disconnecting Means for Isolating Photovoltaic Equipment1 Question
- 6.17690.56 – Identification of Power Sources
- 6.18690.56 – Identification of Power Sources1 Question
- 6.19691.4 Special Requirements for Large-Scale PV Electric Supply Stations
- 6.20691.4 Special Requirements for Large-Scale PV Electric Supply Stations1 Question
- 6.21600.5(A) – Branch Circuits
- 6.22600.5(A) – Branch Circuits1 Question
- 6.23620.12(A) – Traveling Cables
- 6.24620.12(A) – Traveling Cables1 Question
- 6.25690.4(G) – PV Equipment Floating on Bodies of Water
- 6.26690.4(G) – PV Equipment Floating on Bodies of Water1 Question
- NEC 2023 - Code Update (CH 1-8) - NEC Article 700 Series28
- 7.1700.11 Wiring, Class-2-Powered Emergency Lighting Systems
- 7.2700.11 Wiring, Class-2-Powered Emergency Lighting Systems1 Question
- 7.3700.12(E) Stored-Energy Power Supply Systems (SEPSS)
- 7.4700.12(E) Stored-Energy Power Supply Systems (SEPSS)1 Question
- 7.5700.27 Class 2 Powered Emergency Lighting Systems
- 7.6700.27 Class 2 Powered Emergency Lighting Systems1 Question
- 7.7700.32 Selective Coordination
- 7.8700.32 Selective Coordination1 Question
- 7.9700.3(F) Temporary Source of Power for Maintenance or Repair of the Alternate Source of Power
- 7.10700.3(F) Temporary Source of Power for Maintenance or Repair of the Alternate Source of Power1 Question
- 7.11701.10 Wiring Legally Required Standby Systems
- 7.12701.10 Wiring Legally Required Standby Systems1 Question
- 7.13701.4(C) Load Management
- 7.14701.4(C) Load Management1 Question
- 7.15705.10 Identification of Power Sources
- 7.16705.10 Identification of Power Sources1 Question
- 7.17706.7 Commissioning and Maintenance
- 7.18706.7 Commissioning and Maintenance1 Question
- 7.19726.121 Power Sources for Class 4 Circuits
- 7.20726.121 Power Sources for Class 4 Circuits1 Question
- 7.21726.122 Class 4 Loads
- 7.22726.122 Class 4 Loads1 Question
- 7.23726.124 Class 4 Marking
- 7.24726.124 Class 4 Marking1 Question
- 7.25726.130 Terminals and Connectors
- 7.26726.130 Terminals and Connectors1 Question
- 7.27700.12(G) Microgrid Systems
- 7.28700.12(G) Microgrid Systems1 Question
- NEC 2023 - Code Update (CH 1-8) - NEC Article 800 Series4
- NEC 2023 - Grounding and Bonding - NEC Article 100 Series4
- NEC 2023 - Grounding and Bonding - NEC Article 200 Series22
- 10.1250.130 – Equipment Grounding Conductor Connections
- 10.2250.130 – Equipment Grounding Conductor Connections1 Question
- 10.3250.140 – Frames of Ranges and Clothes Dryers
- 10.4250.140 – Frames of Ranges and Clothes Dryers1 Question
- 10.5250.148 – Continuity of Equipment Grounding Conductors and Attachment in Boxes
- 10.6250.148 – Continuity of Equipment Grounding Conductors and Attachment in Boxes1 Question
- 10.7250.36 – Impedance Grounded Systems
- 10.8250.36 – Impedance Grounded Systems1 Question
- 10.9250.70 – Grounding and Bonding Conductor Connection to Electrodes
- 10.10250.70 – Grounding and Bonding Conductor Connection to Electrodes1 Question
- 10.11210.8(B) Other Than Dwelling Units
- 10.12210.8(B) Other Than Dwelling Units1 Question
- 10.13210.8(F) Outdoor Outlets.
- 10.14210.8(F) Outdoor Outlets.1 Question
- 10.15242.2 and 242.9 – Surge Protective Devices
- 10.16242.2 and 242.9 – Surge Protective Devices1 Question
- 10.17250.24(D) – Grounded Conductor Brought to Service Equipment
- 10.18250.24(D) – Grounded Conductor Brought to Service Equipment1 Question
- 10.19230.85 Emergency Disconnects
- 10.20230.85 Emergency Disconnects1 Question
- 10.21250.64(G) – Enclosures with Ventilation Openings
- 10.22250.64(G) – Enclosures with Ventilation Openings1 Question
- NEC 2023 - Grounding and Bonding - NEC Article 300 Series2
- NEC 2023 - Grounding and Bonding - NEC Article 400 Series6
- 12.1410.184 Ground-Fault Circuit-Interrupter (GFCI) Protection and Special Purpose Ground-Fault Circuit-Interrupter (SPGFCI) Protection
- 12.2410.184 Ground-Fault Circuit-Interrupter (GFCI) Protection and Special Purpose Ground-Fault Circuit-Interrupter (SPGFCI) Protection1 Question
- 12.3406.4(D) Receptacle Replacements
- 12.4406.4(D) Receptacle Replacements1 Question
- 12.5406.9 (C) Bathtub and Shower Space
- 12.6406.9 (C) Bathtub and Shower Space1 Question
- NEC 2023 - Grounding and Bonding - NEC Article 500 Series18
- 13.1501.30 Grounding and Bonding
- 13.2501.30 Grounding and Bonding1 Question
- 13.3502.30 Grounding and Bonding
- 13.4502.30 Grounding and Bonding1 Question
- 13.5511.7(A) Wiring in Spaces Above Hazardous (Classified) Locations
- 13.6511.7(A) Wiring in Spaces Above Hazardous (Classified) Locations1 Question
- 13.7517.13 Equipment Grounding Conductor for Receptacles and Fixed Electrical Equipment in Patient Care Spaces
- 13.8517.13 Equipment Grounding Conductor for Receptacles and Fixed Electrical Equipment in Patient Care Spaces1 Question
- 13.9517.14 Panelboard Bonding
- 13.10517.14 Panelboard Bonding1 Question
- 13.11547.44 Equipotential Planes and Bonding of Equipotential Planes
- 13.12547.44 Equipotential Planes and Bonding of Equipotential Planes1 Question
- 13.13551.3 Electrical Datum Plane Distances
- 13.14551.3 Electrical Datum Plane Distances1 Question
- 13.15551.40 120-Volt or 120/240-Volt, Nominal, Systems1 Question
- 13.16551.40 120-Volt or 120/240-Volt, Nominal, Systems
- 13.17555.14 Equipotential Planes and Bonding of Equipotential Planes
- 13.18555.14 Equipotential Planes and Bonding of Equipotential Planes1 Question
- NEC 2023 - Grounding and Bonding - NEC Article 600 Series18
- 14.1620.6 – GFCI Protection for Personnel
- 14.2620.6 – GFCI Protection for Personnel1 Question
- 14.3680.32 – GFCI and SPGFCI Protection
- 14.4680.32 – GFCI and SPGFCI Protection1 Question
- 14.5680.44 – GFCI & SPGFCI Protection
- 14.6680.44 – GFCI & SPGFCI Protection1 Question
- 14.7680.5 – GFCI and SPGFCI Protection
- 14.8680.5 – GFCI and SPGFCI Protection1 Question
- 14.9690.43 – Equipment Grounding and Bonding
- 14.10690.43 – Equipment Grounding and Bonding1 Question
- 14.11690.31 – Wiring Methods
- 14.12690.31 – Wiring Methods1 Question
- 14.13680.26(B)(2) – Equipotential Bonding – Perimeter Surfaces
- 14.14680.26(B)(2) – Equipotential Bonding – Perimeter Surfaces1 Question
- 14.15680.21(D) – Pool Pump Motor Replacement
- 14.16680.21(D) – Pool Pump Motor Replacement1 Question
- 14.17680.54(C) – Equipotential Bonding of Splash Pads
- 14.18680.54(C) – Equipotential Bonding of Splash Pads1 Question
- NEC 2023 - Grounding and Bonding - NEC Article 800 Series2
- NEC 2023 - Wiring Methods - NEC Article 100 Series12
- 16.1110.17 – Servicing and Maintenance of Equipment
- 16.2110.17 – Servicing and Maintenance of Equipment1 Question
- 16.3110.26 – Spaces About Electrical Equipment
- 16.4110.26 – Spaces About Electrical Equipment1 Question
- 16.5110.29 – In Sight From
- 16.6110.29 In Sight From1 Question
- 16.7110.3 – Examination, Identification, Installation, Use, and Listing (Product Certification) of Equipment.
- 16.8110.3 – Examination, Identification, Installation, Use, and Listing (Product Certification) of Equipment.1 Question
- 16.9110.3(I) Job Safety Planning and Job Briefing
- 16.10110.3(I) Job Safety Planning and Job Briefing1 Question
- 16.11110.33(A) and 110.34(A)
- 16.12110.33(A) and 110.34(A)1 Question
- NEC 2023 - Wiring Methods - NEC Article 300 Series20
- 17.1312.10 Screws or Other Fasteners
- 17.2312.10 Screws or Other Fasteners1 Question
- 17.3314.16 Box Fill Calculations
- 17.4314.16 Box Fill Calculations1 Question
- 17.5314.29 Boxes, Conduit Bodies, and Handhole Enclosures to Be Accessible
- 17.6314.29 Boxes, Conduit Bodies, and Handhole Enclosures to Be Accessible1 Question
- 17.7314.5 Screws or Other Fasteners
- 17.8314.5 Screws or Other Fasteners1 Question
- 17.9320.23 In Accessible Attics
- 17.10320.23 In Accessible Attics1 Question
- 17.11334.10 Uses Permitted
- 17.12334.10 Uses Permitted1 Question
- 17.13334.15 (B) Protection from Physical Damage
- 17.14334.15 (B) Protection from Physical Damage1 Question
- 17.15352.10 Uses Permitted for Rigid Polyvinyl Chloride Conduits
- 17.16352.10 Uses Permitted for Rigid Polyvinyl Chloride Conduits1 Question
- 17.17352.44 Expansion Fittings
- 17.18352.44 Expansion Fittings1 Question
- 17.19356.10 Uses Permitted
- 17.20356.10 Uses Permitted1 Question
- NEC 2023 - Wiring Methods - NEC Article 400 Series12
- 18.1404.30 Switch Enclosures with Doors
- 18.2404.30 Switch Enclosures with Doors1 Question
- 18.3408.38 Enclosure
- 18.4408.38 Enclosure1 Question
- 18.5410.10 Luminaires in Specific Locations
- 18.6410.10 Luminaires in Specific Locations1 Question
- 18.7410.195 Locations Not Permitted
- 18.8410.195 Locations Not Permitted1 Question
- 18.9424.48 Installation of Cables in Walls
- 18.10424.48 Installation of Cables in Walls1 Question
- 18.11424.93 Installation of Electric Radiant Heating Panels and Heating Panel Sets
- 18.12424.93 Installation of Electric Radiant Heating Panels and Heating Panel Sets1 Question
- NEC 2023 - Wiring Methods - NEC Article 500 Series2
- NEC 2023 - Wiring Methods - NEC Article 600 Series12
- 20.1600.6 – Disconnects
- 20.2600.6 – Disconnects1 Question
- 20.3620.36 – Different Systems in One Raceway or Traveling Cable.
- 20.4620.36 – Different Systems in One Raceway or Traveling Cable.1 Question
- 20.5646.19 – Entrance to and Egress from Working Space
- 20.6646.19 – Entrance to and Egress from Working Space1 Question
- 20.7680.12 – Equipment Rooms, Vaults, and Pits
- 20.8680.12 – Equipment Rooms, Vaults, and Pits1 Question
- 20.9680.14 Corrosive Environments
- 20.10680.14 Corrosive Environments1 Question
- 20.11680.41 – Location of Other Equipment
- 20.12680.41 – Location of Other Equipment1 Question
- NEC 2023 - Wiring Methods - NEC Article 800 Series2
- NEC 2023 - Theory and Calculations - NEC Article 200 Series32
- 22.1210.19 Conductors – Minimum Ampacity and Size
- 22.2210.19 Conductors – Minimum Ampacity and Size1 Question
- 22.3210.23 Permissible Loads, Multiple-Outlet Branch Circuits
- 22.4210.23 Permissible Loads, Multiple-Outlet Branch Circuits1 Question
- 22.5210.70 Lighting Outlets Required
- 22.6210.70 Lighting Outlets Required1 Question
- 22.7220.110 Receptacle Loads
- 22.8220.110 Receptacle Loads1 Question
- 22.9220.120 Marinas, Boatyards, Floating Buildings, And Commercial and Noncommercial Docking Facilities
- 22.10220.120 Marinas, Boatyards, Floating Buildings, And Commercial and Noncommercial Docking Facilities1 Question
- 22.11220.57 Electric Vehicle Supply Equipment
- 22.12220.57 Electric Vehicle Supply Equipment1 Question
- 22.13220.70 Energy Management Systems (EMSs)
- 22.14220.70 Energy Management Systems (EMSs)1 Question
- 22.15215.15 Barriers
- 22.16215.15 Barriers1 Question
- 22.17210.52(C) Island and Peninsular Countertops and Work Surfaces
- 22.18210.52(C) Island and Peninsular Countertops and Work Surfaces1 Question
- 22.19220.5(C) Floor Areas
- 22.20220.5(C) Floor Areas1 Question
- 22.21230.71(B) Two to Six Disconnecting Means
- 22.22230.71(B) Two to Six Disconnecting Means1 Question
- 22.23240.11 Selective Coordination
- 22.24240.11 Selective Coordination1 Question
- 22.25240.4(B) Overcurrent Devices Rated 8000 Amperes or Less
- 22.26240.4(B) Overcurrent Devices Rated 8000 Amperes or Less1 Question
- 22.27240.4(D)(3) 14 AWG Copper-Clad Aluminum
- 22.28240.4(D)(3) 14 AWG Copper-Clad Aluminum1 Question
- 22.29Table 240.6(A) Standard Ampere Ratings for Fuses and Inverse Time Circuit Breakers
- 22.30Table 240.6(A) Standard Ampere Ratings for Fuses and Inverse Time Circuit Breakers1 Question
- 22.31Table 240.6(D) Remotely Accessible Adjustable-Trip Circuit Breakers
- 22.32Table 240.6(D) Remotely Accessible Adjustable-Trip Circuit Breakers1 Question
- NEC 2023 - Theory and Calculations - NEC Article 300 Series6
- NEC 2023 - Theory and Calculations - NEC Article 400 Series10
- 24.1404.14 Rating and Use of Switches
- 24.2404.14 Rating and Use of Switches1 Question
- 24.3406.3 Receptacle Rating and Type
- 24.4406.3 Receptacle Rating and Type1 Question
- 24.5422.18 Ceiling-Suspended (Paddle) Fans
- 24.6422.18 Ceiling-Suspended (Paddle) Fans1 Question
- 24.7430.6 Conductor Ampacity and Motor Rating Determination
- 24.8430.6 Conductor Ampacity and Motor Rating Determination1 Question
- 24.9440.8 Single Machine and Location
- 24.10440.8 Single Machine and Location1 Question
- NEC 2023 - Theory and Calculations - NEC Article 600 Series4
- NEC 2023 - Theory and Calculations - NEC Article 700 Series10
- 26.1700.4 Capacity and Rating
- 26.2700.4 Capacity and Rating1 Question
- 26.3705.12(A) Feeders and Feeder Taps
- 26.4705.12(A) Feeders and Feeder Taps1 Question
- 26.5726.144 Ampacity
- 26.6726.144 Ampacity1 Question
- 26.7700.12(C) Supply Duration
- 26.8700.12(C) Supply Duration1 Question
- 26.9750.30(C) Capacity of Branch Circuit, Feeder, or Service
- 26.10750.30(C) Capacity of Branch Circuit, Feeder, or Service1 Question
- NFPA 70E 2024 Course Content100
- 27.1Understanding the Purpose and Scope of NFPA 70E 2024 (Article 90)
- 27.2Quiz – Understanding the Purpose and Scope of NFPA 70E 2024 (Article 90)1 Question
- 27.3Key Definitions for Electrical Safety (Article 100)
- 27.4Quiz – Key Definitions for Electrical Safety (Article 100)1 Question
- 27.5Employer and Employee Responsibilities (Article 105)
- 27.6Quiz – Employer and Employee Responsibilities (Article 105)1 Question
- 27.7Core Elements of the Electrical Safety Program (ESP) [Section 110.2 & Section 110.3]
- 27.8Quiz – Core Elements of the Electrical Safety Program (ESP)1 Question
- 27.9Job Safety Planning and Job Briefings [Subdivision 110.3(I)]
- 27.10Quiz – Job Safety Planning and Job Briefings1 Question
- 27.11Training Requirements for Qualified and Unqualified Persons [Subdivision 110.4(A)]
- 27.12Quiz – Training Requirements for Qualified and Unqualified Persons1 Question
- 27.13Safe Selection and Use of Test Instruments [Section 110.6]
- 27.14Quiz – Safe Selection and Use of Test Instruments1 Question
- 27.15The Priority of an Electrically Safe Work Condition [Subdivision 110.2(B)]
- 27.16Quiz – The Priority of an Electrically Safe Work Condition1 Question
- 27.17Principles of a Lockout/Tagout (LOTO) Program [Section 120.3]
- 27.18Quiz – Principles of a Lockout/Tagout (LOTO) Program1 Question
- 27.19Simple vs. Complex Lockout/Tagout Procedures [Section 120.5]
- 27.20Quiz – Simple vs. Complex Lockout/Tagout Procedures1 Question
- 27.21The Step-by-Step De-energization Process [Section 120.6]
- 27.22Quiz – The Step-by-Step De-energization Process1 Question
- 27.23Verifying the Absence of Voltage [Subdivision 120.6(7)]
- 27.24Quiz – Verifying the Absence of Voltage1 Question
- 27.25Justifying Energized Work and the Energized Electrical Work Permit (EEWP)
- 27.26Quiz – Justifying Energized Work and the Energized Electrical Work Permit (EEWP)1 Question
- 27.27Performing an Electric Shock Risk Assessment [Section 130.4]
- 27.28Quiz – Performing a Shock Risk Assessment1 Question
- 27.29Limited and Restricted Approach Boundaries [Subdivision 130.4(E)]
- 27.30Quiz – Limited and Restricted Approach Boundaries1 Question
- 27.31Performing an Arc Flash Risk Assessment [Section 130.5]
- 27.32Quiz – Performing an Arc Flash Risk Assessment1 Question
- 27.33Determining the Arc Flash Boundary [Section 130.7]
- 27.34Quiz – Determining the Arc Flash Boundary1 Question
- 27.35Methods for Selecting Arc Flash PPE [Subdivision 130.5(F)]
- 27.36Quiz – Methods for Selecting Arc Flash PPE1 Question
- 27.37Understanding Arc Flash PPE Categories [Table 130.7(C)(15)(c)]
- 27.38Quiz – Understanding Arc Flash PPE Categories1 Question
- 27.39Requirements for Arc-Rated Clothing and Underlayers [Subdivision 130.7(C)(9)(c)]
- 27.40Quiz – Requirements for Arc-Rated Clothing and Underlayers1 Question
- 27.41Head, Face, Hand, and Foot Protection [Table 130.7(C)(15)(c)]
- 27.42Quiz – Head, Face, Hand, and Foot Protection1 Question
- 27.43General Requirements for Safety-Related Maintenance [Article 205]
- 27.44Quiz – General Requirements for Safety-Related Maintenance1 Question
- 27.45Maintenance of Switchgear, Panelboards, and MCCs [Article 210]
- 27.46Quiz – Maintenance of Switchgear, Panelboards, and MCCs1 Question
- 27.47Maintenance of Fuses and Circuit Breakers [Article 225]
- 27.48Quiz – Maintenance of Fuses and Circuit Breakers1 Question
- 27.49Safety Practices for Batteries and Battery Rooms [Article 320]
- 27.50Quiz – Safety Practices for Batteries and Battery Rooms1 Question
- 27.51Overview of the NFPA 70E Informative Annexes
- 27.52Quiz – Overview of the NFPA 70E Informative Annexes1 Question
- 27.53Defining and Using the Arc Flash Boundary (Subdevision130.5(E))
- 27.54Quiz – Defining and Using the Arc Flash Boundary (Subdivision 130.5(E))1 Question
- 27.55PPE Selection: Incident Energy Analysis Method (Subdivision130.5(G))
- 27.56Quiz – PPE Selection: Incident Energy Analysis Method (Subdivision130.5(G))1 Question
- 27.57PPE Selection: Arc Flash PPE Category Method (Subdivision130.7(C)(15))
- 27.58Quiz – PPE Selection: Arc Flash PPE Category Method (Subdivision 130.7(C)(15))1 Question
- 27.59Using the PPE Category Tables for AC Systems (Table 130.7(C)(15)(a))
- 27.60Quiz – Using the PPE Category Tables for AC Systems (Table 130.7(C)(15)(a))1 Question
- 27.61Using the PPE Category Tables for DC Systems (Table 130.7(C)(15)(b))
- 27.62Quiz – Using the PPE Category Tables for DC Systems (Table 130.7(C)(15)(b))1 Question
- 27.63Requirements for Arc-Rated and Underlayer Clothing (Subdivision 130.7(C))
- 27.64Quiz – Requirements for Arc-Rated Clothing and Underlayers1 Question
- 27.65Personal Protective Equipment: Head, Face, Hand, and Foot Protection (Section 130.7)
- 27.66Quiz – Personal Protective Equipment: Head, Face, Hand, and Foot Protection (Section 130.7)1 Question
- 27.67Care, Inspection, and Maintenance of PPE (Subdivision 130.7(B))
- 27.68Quiz – Care, Inspection, and Maintenance of PPE (Subdivision 130.7(B))1 Question
- 27.69Barricades, Attendants, and Alerting Techniques (Subdivision 130.8(O))
- 27.70Quiz – Barricades, Attendants, and Alerting Techniques (Subdivision 130.8(O))1 Question
- 27.71The Importance of Safety-Related Maintenance (Article 200, 205)
- 27.72Quiz – The Importance of Safety-Related Maintenance (Article 200, 205)1 Question
- 27.73Maintenance of Switchgear, Panelboards, and Motor Control Centers (Article 210)
- 27.74Quiz – Maintenance of Switchgear, Panelboards, and Motor Control Centers (Article 210)1 Question
- 27.75Maintenance of Fuses and Circuit Breakers (Article 225)
- 27.76Quiz – Maintenance of Fuses and Circuit Breakers (Article 225)1 Question
- 27.77Maintenance of Rotating Equipment and Controller Equipment (Article 220,230)
- 27.78Quiz – Maintenance of Rotating Equipment and Controller Equipment (Article 220,230)1 Question
- 27.79General Safety Requirements for Special Equipment (Article 300)
- 27.80Quiz – General Safety Requirements for Special Equipment (Article 300)1 Question
- 27.81Safety Practices for Batteries and Battery Rooms (Article 320)
- 27.82Quiz – Safety Practices for Batteries and Battery Rooms (Article 320)1 Question
- 27.83Safety Practices for Lasers (Article 330)
- 27.84Quiz – Safety Practices for Lasers (Article 330)1 Question
- 27.85Safety Practices for Power Electronic Equipment (Article 340)
- 27.86Quiz – Safety Practices for Power Electronic Equipment (Article 340)1 Question
- 27.87Safety Requirements for Research and Development Labs (Article 350)
- 27.88Quiz – Safety Requirements for Research and Development Labs (Article 350)1 Question
- 27.89Safety Requirements for Capacitors (Article 360)
- 27.90Quiz – Safety Requirements for Capacitors (Article 360)1 Question
- 27.91Applying Informative Annex F: Risk Assessment and Risk Control
- 27.92Quiz – Applying Informative Annex F: Risk Assessment and Risk Control1 Question
- 27.93Applying Informative Annex H: Guidance on PPE Selection
- 27.94Quiz – Applying Informative Annex H: Guidance on PPE Selection1 Question
- 27.95Applying Informative Annex I: Job Briefing and Planning Checklist
- 27.96Quiz – Applying Informative Annex I: Job Briefing and Planning Checklist1 Question
- 27.97Applying Informative Annex J: Energized Electrical Work Permit Example
- 27.98Quiz – Applying Informative Annex J: Energized Electrical Work Permit Example1 Question
- 27.99Core Elements of the Electrical Safety Program (ESP) [Section 110.2 & Section 110.3]
- 27.100Quiz – Course Review and Real-World Application Scenarios1 Question



